A planning permission usually outline, may specifically reserve for later consideration some matters not relating to the principles of the proposed development. Matters reserved at outline stage can include access, appearance, layout, scale and landscaping. This can also refer to conditions placed on a full planning permission that require the approval of additional matters such as materials.
Revocation
Revocation – when something is cancelled or taken away, such as the SRA revoking an individual”s permission to practise as a solicitor.
Rights of audience
Rights of audience – generally a right of a lawyer to appear and conduct proceedings in court on behalf of their client.
Risk
Risk – the likelihood that a particular choice or action might lead to a loss or damage.
Risk Assessment
An examination of the potential risks in the workplace, with the aim of assessing whether enough precautions have been put in place to prevent harm. A risk assessment focuses on the relationship between the worker, the work being carried out, the equipment being used and the conditions of the working environment.
Risk Management
The process of putting control measures into practice and monitoring the results, with the intention of reducing, or eliminating, the potential risks to health and safety.
Roll of solicitors
Roll of solicitors – a list of all admitted solicitors held by the Law Society.
Routes of Entry
Ways in which hazardous substances can enter the body, including inhalation, injection, ingestion and absorption.